Lee Teicheira and Bill Lawrence continued the process of replacing the fuselage rear skin to longeron rivets that were too short. The bottom row of CCP42 rivets were replaced with CCP43s on both sides. About 60 rivets were drilled out today, the holes deburred and new longer rivets were installed.The upper row with the overlapping skins will require CCP44s, which are on order.